Off-Market Data Center Sourcing & Strategy

We unlock capacity where others see constraints. From powered land to turnkey hyperscale suites, we manage the entire asset lifecycle for AI deployment.

Readiness

The Asset Spectrum

We qualify off-market assets across four distinct stages of readiness, allowing you to enter the value chain at the point that matches your deployment timeline.

Powered Land

Raw land with secured utility power contracts. Ideal for custom campus builds with 24-36 month timelines.

Greenfield / Brownfield

Sites with permits in place or existing industrial shells ready for conversion. 18-24 month delivery.

Powered Shell

Constructed facility with power and cooling infrastructure. Tenant handles fit-out. 6-12 month delivery.

Turnkey Ready

Move-in ready data halls. Racks, cooling, and power distribution installed. Immediate to 3 month delivery.

Capacity Timeline

Our forward-looking pipeline provides visibility into 2026-2028 availability. By engaging early, enterprises secure better pricing and guarantee power in constrained markets.

First Mover Advantage

75% of our 2026 inventory is already under negotiation. We recommend a 12-month lead time for >5MW requirements.

Secured capacity vs. planned envelope

Live capacityPlanned envelope

Advisory

Strategic Advisory

Power Strategy: BTM vs. Grid

Behind The Meter (BTM)

Direct connection to generation assets (Solar/Wind/Nuclear). Critical for circumventing grid congestion and ensuring 100% renewable uptime for training clusters.

Grid Connected

Standard utility connection. We analyze substation capacity and time-to-power reality versus utility promises.

Supply Chain & LLE

Long Lead Equipment (LLE)

Transformers, chillers, and generators now have 50+ week lead times. We identify sites where LLE is pre-ordered or already on-site.

Deployment Velocity

Matching hardware delivery with facility readiness to prevent capital dormancy.

Financial Structuring

We assist in structuring deals that optimize CapEx vs. OpEx.

  • Traditional Triple Net Lease
  • Powered Shell with Tenant Improvement Allowance
  • Joint Venture / Co-location models
  • Build-to-Suit financing

Location Strategy

Balancing latency requirements with TCO.

TrainingLow power cost prioritized. Rural / Nordics / Mid-West.
InferenceLow latency prioritized. Edge of major metros (FLAP, Ashburn).

Process

Global Scale Qualification Process

1

Off-Market Sourcing

Identifying assets before they are listed. Leveraging landowner and developer relationships.

2

Technical Diligence

Verifying utility availability letters, fiber diversity, and LLE delivery schedules.

3

Commercial Structure

Negotiating PPA rates, SLA terms, and lease flexibility. Ensuring favorable cost structures.

4

Execution

Managing the handoff to operations. Finalizing fit-out and hardware installation.

Secure Your Future Capacity

The window for 2026 delivery is closing. Contact our infrastructure team to review available off-market assets.